Resource Planning That Checks Itself Against Reality

Schedule assignments per member and week, then let Rize compare the plan to automatically tracked hours. Capacity, allocation, and utilization measured against real availability — no timesheets to chase.

How it works

The plan and the tracked work on the same grid, so utilization is measured instead of guessed.

01

Scheduled Assignments by Member and Week

Add an assignment to a member for a client, project, or task with hours per day and a date range. Drag across days to select a range, edit or resize in place, assign PTO, and clear a period when the plan changes.

02

Scheduled vs. Tracked, Side by Side

Allocation bars show scheduled hours and automatically tracked hours per client and project, with a warning when a plan exceeds the budget. The Tracked + Planned report charts tracked hours against planned hours and capacity for the period.

03

Capacity from Real Availability

Planning settings define the working week, public holidays, and company days off, so capacity is calculated from days people are actually available — not a flat 40 hours.

04

CSV Plan Import

Bring an existing schedule in from a spreadsheet or another planning tool. Upload a CSV, preview how each row maps to members and projects, then commit the batch. The same import is in the public API as create_planned_time_allocations.

05

Team and Organization Views

Each team gets its own Resourcing page, and the organization view shows every team's plan in one place with a team selector and the same client, project, and task filters. Team Timesheets carry the same capacity signals.

06

Allocation in the Agent, API, and MCP

Ask the Rize agent who is over capacity next week, or read allocations through the API and Rize MCP. Every change to the plan is recorded, so you can see who moved what and when.

The numbers

What changes when the plan is checked against tracked hours every day.

2

Views per member: scheduled and tracked hours

0

Timesheets required to measure utilization

100%

Of plan changes recorded in planning history

1 click

From capacity warning to member load table

How teams plan capacity with Rize

Three worked examples, from a retainer agency's burn plan to an accounting firm's staffing grid.

Agency ops lead on retainers

40-person agency, ClickUp for work, Float for planning

The staffing plan lives in Float, but nobody trusts the timesheets underneath it. Monthly burn reports arrive a week or two into the month, after clients have already been over-serviced.

With Rize: Assignments are scheduled per member and week, and tracked hours land against them automatically. The over-capacity warning fires while the week is still recoverable, and ClickUp estimates flow in without a second entry.

In-house client services team

80-person ops org, Asana, capacity model in a spreadsheet

Leadership wants validated capacity numbers for hiring and budgeting, but salaried professionals will not run timers and the spreadsheet is stale the day it is built.

With Rize: The CSV import brings the existing plan in. Scheduled versus tracked shows which contracts actually consume the team, and the capacity readout at day 30 validates or corrects the model.

Accounting firm staffing tax season

60-person CPA firm, offshore staff, Karbon workflow

Partners assign engagements by gut feel. Some seniors are overloaded while others look full on paper but are not, and nobody finds out until deadlines slip.

With Rize: Each member's allocated hours sit against their real capacity, holidays included. The member load table shows who is overbooked before the week starts, not after.

See who is overbooked before the week starts

Plan assignments, import your existing schedule, and measure utilization against tracked hours. Free 7-day trial, no credit card required.

Frequently Asked Questions

The best resource planning tool for agencies compares the plan to what actually happened. Planning tools like Float and Resource Guru know what was scheduled; time trackers know what was logged. Rize does both: you schedule assignments per member and week, and Rize's automatic tracking shows tracked hours next to planned hours per client and project, so overbooking surfaces while there is still time to move work.

Team utilization is tracked hours divided by available capacity. The hard part is getting honest tracked hours when people fill timesheets late or copy last week forward. Rize tracks time automatically and calculates capacity from your working days, holidays, and PTO, so utilization per member, client, and project is measured against real availability.

Yes. Rize covers the same job — scheduling assignments per member and week, allocation per client and project, capacity warnings — and adds the part Float cannot do: checking the plan against automatically tracked hours every day. You can import an existing plan from CSV instead of rebuilding it by hand.

Schedule the plan first: assignments per member with hours per day and a date range. Rize then tracks work automatically and shows planned versus tracked per client, project, and member in the Tracked + Planned report and on the Resourcing page. Differences per member are visible for the period you choose.

Yes. If you plan in ClickUp, time estimates come in on their own so you can see who is overbooked before the week starts. Any other plan can come in by CSV upload or through the public API's create_planned_time_allocations mutation.

Planning settings define the working week, public holidays, and company days off, and PTO can be assigned to a member like any other assignment. Capacity is calculated from the days people are actually available, so a holiday week does not read as under-utilized.

Yes. Resourcing reports roll up to the member, team, client, and project level — hours and allocation, not activity feeds. Rize takes no screenshots and logs no keystrokes, which is why teams that rejected monitoring tools still run it.

The Resourcing page shows a warning when a plan exceeds the budget, and tracked hours keep accumulating against the assignment so you can see the overrun forming. Ops leads use it to move work before someone is over capacity, or to re-scope the client while the month is still recoverable.

Yes. Allocations are available through the Rize public API and the Rize MCP, including the create_planned_time_allocations mutation for bulk plan import. The Rize agent can also answer questions about capacity and allocation directly in chat.

Each team has a Resourcing page, and the organization view aggregates every team's plan with the same client, project, and task filters. Resourcing grants in Teams and Permissions control who can edit the plan versus view it.