How it works
The plan and the tracked work on the same grid, so utilization is measured instead of guessed.
01
Scheduled Assignments by Member and Week
Add an assignment to a member for a client, project, or task with hours per day and a date range. Drag across days to select a range, edit or resize in place, assign PTO, and clear a period when the plan changes.
02
Scheduled vs. Tracked, Side by Side
Allocation bars show scheduled hours and automatically tracked hours per client and project, with a warning when a plan exceeds the budget. The Tracked + Planned report charts tracked hours against planned hours and capacity for the period.
03
Capacity from Real Availability
Planning settings define the working week, public holidays, and company days off, so capacity is calculated from days people are actually available — not a flat 40 hours.
04
CSV Plan Import
Bring an existing schedule in from a spreadsheet or another planning tool. Upload a CSV, preview how each row maps to members and projects, then commit the batch. The same import is in the public API as create_planned_time_allocations.
05
Team and Organization Views
Each team gets its own Resourcing page, and the organization view shows every team's plan in one place with a team selector and the same client, project, and task filters. Team Timesheets carry the same capacity signals.
06
Allocation in the Agent, API, and MCP
Ask the Rize agent who is over capacity next week, or read allocations through the API and Rize MCP. Every change to the plan is recorded, so you can see who moved what and when.
The numbers
What changes when the plan is checked against tracked hours every day.
2
Views per member: scheduled and tracked hours
0
Timesheets required to measure utilization
100%
Of plan changes recorded in planning history
1 click
From capacity warning to member load table
How teams plan capacity with Rize
Three worked examples, from a retainer agency's burn plan to an accounting firm's staffing grid.
Agency ops lead on retainers
40-person agency, ClickUp for work, Float for planning
The staffing plan lives in Float, but nobody trusts the timesheets underneath it. Monthly burn reports arrive a week or two into the month, after clients have already been over-serviced.
With Rize: Assignments are scheduled per member and week, and tracked hours land against them automatically. The over-capacity warning fires while the week is still recoverable, and ClickUp estimates flow in without a second entry.
In-house client services team
80-person ops org, Asana, capacity model in a spreadsheet
Leadership wants validated capacity numbers for hiring and budgeting, but salaried professionals will not run timers and the spreadsheet is stale the day it is built.
With Rize: The CSV import brings the existing plan in. Scheduled versus tracked shows which contracts actually consume the team, and the capacity readout at day 30 validates or corrects the model.
Accounting firm staffing tax season
60-person CPA firm, offshore staff, Karbon workflow
Partners assign engagements by gut feel. Some seniors are overloaded while others look full on paper but are not, and nobody finds out until deadlines slip.
With Rize: Each member's allocated hours sit against their real capacity, holidays included. The member load table shows who is overbooked before the week starts, not after.